Reports until 16:33, Friday 03 November 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:33, Friday 03 November 2017 - last comment - 16:34, Friday 03 November 2017(39282)
Ops Shift Summary
TITLE: 11/03 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

15:44 - 18:14 UTC TJ to HAM3
15:51 UTC Snovalley through gate
15:51 - 17:03 UTC Jason to LVEA cleanroom with part, then adjusting PSL environmental controls
15:51 UTC Krishna to end X to work on BRS
15:53 - 15:59 UTC Travis to LVEA West bay to look for cables for SR2 OSEM
16:25 - 17:13 UTC Hugh to end Y to center BRS colocated T240 masses
16:26 - 17:30 UTC Travis to HAM4 to swap cables for SR2 OSEM
16:39 - 17:30 UTC Jeff K. to HAM4 with CDS laptop to help Travis
17:23 UTC Tour in CR
18:04 - 18:12 UTC Jason to optics lab
19:18 - 20:51 UTC Gerardo to HAM5 to unlock the OFI and install EQ stops
19:41 - 22:02 UTC Terry M. to squeezer bay
Dave reports chiller alarm at end Y, Bubba notified
20:57 - 23:03 UTC TJ and Jim to HAM2 to build and install baffle
21:30 - 22:48 UTC Rakesh walking around LVEA
21:54 UTC HEPI L0 pump controller crashed, Hugh and Filiberto investigating
22:07 UTC Jeff K. to HAM4 to B&K hammer
22:16 UTC h1iscex IO chassis power glitched. Something Krishna might have done at end X. Dave went to end X and restarted the frontend.
Comments related to this report
patrick.thomas@LIGO.ORG - 16:34, Friday 03 November 2017 (39283)
23:34 UTC Kyle done WP 7205