Reports until 16:14, Tuesday 07 November 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:14, Tuesday 07 November 2017 (39326)
Ops Day Shift Summary
Ops Shift Log: 11/07/2017, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked for vent
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Work continues in the LVEA closing out items so doors can be reinstalled.
 
Activity Log: Time - UTC (PT)
16:00 (08:00) Start of shift
16:05 (08:05) Christina – Cleaning at End-X
16:15 (08:15) Pest control on site – Chris S. to escort
16:23 (08:23) Norco on site to deliver N2 to CP-4
16:45 (08:45) Soft Drink vendor on site to stock machines
17:03 (09:03) Travis – Going to Biergarten to work on BS baffle
17:33 (09:33) Cintas on site to change out mats
17:35 (09:35) Cheryl & Ed – Going to HAM2 for IO work
17:46 (09:46) Jason – Shutting off ISS as part of increase of Diode power
17:48 (09:48) Jeff K. – Going to HAM2
17:51 (09:51) Port-a-Pottie on site to service portable toilets
17:55 (09:55) Filiberto – Going to End-Y and End-X to check on how the BRSs are powered
17:57 (09:57) Dave – Doing HAM2 – HAM6 ISI model changes (WP #7206)
18:02 (10:02) Krishna – Going to End-X to power cycle BRS
18:05 (10:05) Richard – Going to HAM6 to make measurements
18:10 (10:10) Peter – Going into PSL enclosure to recover power meter
18:18 (10:18) Karen & Vanessa – Cleaning at End-Y
18:35 (10:35) Kyle – Working on CP2 ion pump install (WP #7204)
18:41 (10:41) Krishna – Back from End-X
18:45 (10:45) Jeff K – Transition to Laser Hazard
18:45 (10:45) Pest control finished and leaving site
18:52 (11:52) Jim – Going to HAM3
19:09 (11:09) Norco on site to deliver N2 to CP-1
19:20 (11:20) Karen & Vanessa – Coming back from End-Y
19:38 (11:38) Jeff K. – Out of the LVEA
19:41 (11:41) Ed – Out of the LVEA
20:06 (12:06) Cheryl – Out of the LVEA
21:02 (13:02) Jim, TJ, & Krishna – Going to Biergarten to work on baffles
21:22 (13:22) Betsy – Going to Biergarten
21:31 (13:31) Richard & Gerardo – Going to HAM6 area
21:31 (13:31) Jason – Going into Biergarten
21:34 (13:34) Travis – Going to Biergarten
21:36 (13:36) Ed – Going to HAM2 for IO work
22:12 (14:12) Filiberto – Going to End-X
22:22 (14:22) Koji – Going into Optics Lab – OFI work
22:44 (14:44) Cheryl & Ed – Out of the PSL enclosure
23:30 (15:30) Gerardo – Going to HAM4/5
23:40 (15:40) Betsy, Jason, TJ, Krishna, and Travis – Out of the LVEA
00:00 (16:00) LVEA back to laser safe