Reports until 17:31, Thursday 09 November 2017
H1 AOS (AOS, SQZ)
gerardo.moreno@LIGO.ORG - posted 17:31, Thursday 09 November 2017 - last comment - 19:44, Thursday 09 November 2017(39366)
OFI Optics Table

Table is ready to be removed from its cage, all earthquake stops were removed, earthquake stop plates, and suspension wires set aside.

Tomorrow the OFI table can be removed and moved to the optics lab for testing.

Comments related to this report
koji.arai@LIGO.ORG - 19:44, Thursday 09 November 2017 (39369)

The OFI test setup in the optics lab has been rebuit. Almost ready for the OFI test. The laser source table of the beam launcher was reused as the fiber coupled light source while the beam launcher table is kept as it is. Just the fiber coupler was taken from the mount on the beam launcher table. The output fiber coupler was placed on the table at 6" height. The beam was mode matched to the mode for the OFI (2mm in radius).

Images attached to this comment