H1 TCS (TCS)
greg.grabeel@LIGO.ORG - posted 17:22, Friday 10 November 2017 (39390)
TCS CO2 Table Reposition

The TCS CO2 Y table is approximately in its new location. Unfortunately, this new location is partially off the technical slab, one leg is mostly off as seen in the first photo. While lowering the table off of the wheels one bolt sheared off, so I removed the wheel for now and moving will have to be done with a pallet jack. The new baffle hardware has also been installed with a temporary plate. The panel has a hole too large for the new hardware and this plate will be used until a new panel comes in. The next step is to install the new BSC viewport pieces and lightpipe. 