Reports until 08:01, Monday 13 November 2017
LHO General
thomas.shaffer@LIGO.ORG - posted 08:01, Monday 13 November 2017 (39398)
Ops Day Shift Transition

TITLE: 11/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 10mph Gusts, 8mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.55 μm/s
QUICK SUMMARY: Vent work continues