Reports until 16:10, Monday 13 November 2017
LHO General
thomas.shaffer@LIGO.ORG - posted 16:10, Monday 13 November 2017 (39399)
Ops Day Shift Summary

TITLE: 11/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Purge air work took up the morning, and then a few crews went in. MC2 and PR2 WD have tripped, but I will wait for the SEI crew to finish the balancing before someone (not me) untrips it. Film crew is out in the LVEA with Keita.
LOG: