Gerardo M., T. Sadecki
Gerardo removed the SRM HR baffle in order to access the SRM optic. It has been left uninstalled on the HAM 5 table since we will do another round of FC cleaning at closeout. If the baffle crew needs to reinstall it for alignment, feel free to do so. The First Contact has been removed from SRM so that OFI alignment can proceed. SRM was re-suspended but the EQ stops have not been locked down.