Displaying report 1-1 of 1.
Reports until 19:09, Wednesday 22 August 2012
H1 IOO
david.feldbaum@LIGO.ORG - posted 19:09, Wednesday 22 August 2012 (3947)
IO FI alignment in PSL

This morning we noticed that the magnetic rotator is not in full contact with its mount. Cheryl identified the problem as due to the fact that the thru-holes drilled in the restraining Omega-shaped rings are not well matched to the corresponding screw-holes in the mount. I gave her the restraining rings for adjustment.

This means that the magnetic rotator is not secured in its mount at the moment. I will not be placing any optics (TGGs and Quartz) inside the magnet until it is secured (required for steps 20-on of the procedure in E0900301).

I have gone through steps 1 thru 19 of E0900301 (at low powers only).

Steps 16-17, s-pol extinction by the 1st Calcite Wedge Polarizor:

s-pol extinction by 1st CWP
incident trans s-pol extinction
1 W 0.59 µW 62.2 dB
5 W 0.13 mW 45.8 dB
10 W 0.26 mW 45.8 dB

Step 19, s-pol extinction by both CWPs:

s-pol extinction by both CWPs
incident trans s-pol extinction
9.85 W 0.313 mW 45.0 dB

Some more adjustment is needed to get to the required extinction of 50 dB.

Displaying report 1-1 of 1.