Reports until 16:06, Friday 17 November 2017
H1 General
jim.warner@LIGO.ORG - posted 16:06, Friday 17 November 2017 (39472)
Shift Summary

TITLE: 11/18 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

16:30 Nutsinee to SQZ
17:00 TJ to HAM5, Nutsinee and Terry to SQZ, JeffB to LVEA
17:15 Gerardo to HAM5
17:45 Ed, Fil moving squeezer electronics into LVEA
18:15 Travis to HAM5
18:51 TJ - Out of the LVEA
18:52 Travis - Out of the LVEA
21:15 Travis, Jason to LVEA for elliptical baffles
22:00 Peter out of PSL
22:30 Travis out
23:00 Travis, Gerardo to HAM6, removing main viewport
23:15 TJ, Sheila to HAM5
0:00 Travis out