Reports until 16:00, Monday 20 November 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:00, Monday 20 November 2017 (39490)
Ops Day Shift Summary
Ops Shift Log: 11/20/2017, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked - Vent
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Continuing vent work
 
Activity Log: Time - UTC (PT)
16:00 (08:00) Start of shift
16:15 (08:15) Peter – Add 250ml water to Chrystal chiller
16:26 (08:26) Terry – Going into Squeezer Bay
17:32 (09:32) Hugh – Going to HAM6 to trouble shoot CPS problem
17:37 (09:37) TJ – HAM5 to remove spacers
17:40 (09:40) Jeff K. – Transition to Laser Hazard
17:55 (09:55) Ed – Going to LVEA for HAM2 work
18:07 (10:07) Sheila – Going to Squeezed Bay
18:10 (10:10) TJ – Out of the LVEA
18:18 (10:18) Gerardo – Going to HAM5
18:41 (10:41) Gerardo – Out of LVEA until there is a beam at HAM6
18:58 (10:58) Peter – Going into LVEA to switch PSL temp sensor leads
18:58 (10:58) Travis – Going to HAM5
19:20 (11:20) Betsy – Going to HAM5
19:24 (11:24) Karen & Vanessa – Cleaning at Mid-X then Mid-Y
20:18 (12:18) Betsy & Travis – Out of LVEA
20:19 (12:19) Karen & Vanessa – Back from cleaning at the mid-stations
21:05 (13:05) Nutsinee – Going to the Squeezer Bay
21:15 (13:15) Jeff K. & Ed – Going back to HAM5
21:20 (21:20) TJ – Going into the LVEA for parts and then into the Optics lab
21:31 (13:31) Gerardo & Travis – Going to reinstall viewport in HAM5
22:23 (14:23) TJ – Out of Optics lab
23:17 (15:17) Sheila – Going to Squeezer Bay
23:23 (15:23) Travis – Out of the LVEA
23:25 (15:25) TJ – Going to HAM5
23:56 (15:56) TJ – Out of the LVEA
00:00 (16:00) End of shift