Reports until 16:00, Monday 27 November 2017
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:00, Monday 27 November 2017 (39530)
Ops Day Shift Summary
Ops Shift Log: 11/27/2017, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked - Vent
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Continuing vent work
 
Activity Log: Time - UTC (PT)
16:00 (08:00) Start of shift
17:00 (09:00) Vent planning meeting in CR
17:41 (09:41) Filiberto – Going to install illuminator at BS2
17:55 (09:55) Terry – Going to Squeezer Bay
17:56 (09:56) Cheryl – Going to HAM2/HAM3
18:00 (10:00) Dave – Working on FW1 problem
18:02 (10:02) Nutsinee – Going to Squeezer Bay
18:15 (10:15) Jeff K. – Going into the LVEA
18:17 (10:17) Betsy – Going into LVEA for alignment work
18:22 (10:22) Travis – Going into LVEA for Viewport work
18:49 (10:49) Peter – Going into the Optics Lab
19:09 (11:09) Travis – Out of LVEA
19:33 (11:33) TJ – Going into LVEA to electrically insulate HWS cameras
20:06 (12:06) Richard – Going to talk with Filiberto in the LVEA
20:10 (12:10) Richard – Out of the LVEA
20:12 (12:12) TJ – Out of the LVEA
20:33 (12:33) Hanford Emergency Broadcast/Notification alert
21:13 (13:13) TJ – Going into the LVEA
21:14 (13:14) Travis – Going to BSC2 to install vibration absorbers
21:26 (13:26) Betsy – Out of the LVEA
21:30 (13:30) Jeff K., Keita, & Sheila – Out of the LVEA
22:18 (14:18) Peter – Going into the Optics Lab
22:21 (14:21) Richard – Going into LVEA to help Filiberto at HWS table
22:30 (14:30) Richard – Out of the LVEA
22:40 (14:40) Keita, Betsy, Cheryl, & Jeff K. – Into LVEA to continue alignment work
23:12 (15:12) Peter – Out of the Optics Lab
23:28 (15:28) TJ & Filiberto – Finished in the LVEA
00:00 (16:00) End of Shift