(Jax, Elli) At 13:59:25 local time (20:59:25 UTC) 630mA was requested from each segement of the ITM. Cavity scans are being recorded. We'll turn the ITM ring heater off after 3 hours.
Running the ring heater is affecting the alignment of the cavity a lot, I'm having to increase the pitch offset on the ITM by about 25 counts every 2 minutes. Wavefront sensors are on.
Ring heater has been swtiched off at 17:31.