Sheila, TJ, Lisa Here is a quick summary of the work that happened this week in the optics lab to start populating the VOPO Injection Platform. We: * located all of the VIP components (thanks to Betsy and others!) * gathered and cleaned all of the optics that are needed (picture) * started assembling the optomechanics * started gathering parts to set up the laser path to make measurements of the SQZ Faraday throughput and isolation So..all good. Note: All of the OFI parts that were sitting on the table have been grouped in a corner of the table.