Reports until 10:00, Monday 04 December 2017
H1 SEI
jeffrey.bartlett@LIGO.ORG - posted 10:00, Monday 04 December 2017 (39619)
BRS 7-Week Drift Trends (FAMIS #8043)
   Posted are the results for the BRS 7-Week drift trends. The events during the 10-30 to 11-06 week are Krishna rebuilding the BRS-X and some minor work on BRS-Y. The BRS-X event at the end of November was Krishna and Mike doing some centering work.    
Images attached to this report