TITLE: 12/09 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
16:00 LVEA is LASER SAFE
16:12 Vanessa and Karen out
16:28 Kantoro and Umakant to visit the roof for the view.
16:40 Kantoro and Umakant back inside and going for a drive to EX to have a look around outside.
16:43 Mark and Tyler out
17:00 Kantoro and Umakant back
17:05 Hugh in to LVEA/ HAM5 for ISI locking/payload documenting
17:12 Fil into LVEA/HAM5 for ground loop checks
H1:IMC-PWR_IN_OUT1617:22 Travis in to biergarten and HAM5
17:26 Betsy into LVEA/HAM5
17:33 Mark and Tyler into LVEA (TMDS)
17:30 Jeff B and Rakesh into LVEA to inspect cleanrooms
18:00 LVEA is LASER SAFE
18:02 Richard into LVEA/HAM5
18:05 Rakesh out
18:15 Jeff B out
18:20 Sheila going into the opticslab/squeezer bay
18:23 Chandra in to LVEA/GV4
18:36 Stefan in to LVEA/HAM5
18:37 Bubba in to LVEA
18:47 Stefan out
18:55 Cheryl in to LVEA/HAM2 for vacuuming
19:30 Sheila into LVEA w/Umakant
19:35 N out of optics lab
19:54 N back to optics lab
19:55 Bijesh into LVEA/HAM5
20:02 TJ into LVEA/HAM5
20:05 Karen and Vanessa leaving EX for Corner
20:09 Richard out
20:12 TJ out
20:18 Richard out
20:20 Bubba, Mark, Tyler, Travis, Betsy and Terry out
20:40 N out
20:52 Cheryl out
20:56 Betsy in to LVEA/HAM5
20:57 Travis into LVEA
21:03 Hugh out
21:06 Betsy into LVEA
21:09 Richard into LVEA
21:23 Jeff B and Kantoro in to LVEA
21:28 Chandra in to LVEA
21:30 Mark and Tyler in to LVEA
21:31 Richard out
21:41 Chandra out
21:52 Cheryl in to LVEA/HAM2
21:51 Fil in to LVEA/TCS tables (testing access system)
22:03 Bubba to the LVEA
22:04 Kyle in to LVEA/HAM4-5 (top of tube)
22:13 Bubba out
22:19 N in to LVEA/Squeezer
22:20 EX HEPI Pump Controller restarted
22:43 Terry in to LVEA squeezer bay
22:45 N out
23:00 TJ and Sheila in to LVEA
23:02 Fil in to EY
23:20 Hugh into LVEA/HAM5
23:25 Travis out
23:26 Chandra in to LVEA
23:27 Betsy out
23:38 Chandra out
32:41 N into LVEA
23:43 Hugh out