Reports until 08:18, Friday 08 December 2017
H1 General
edmond.merilh@LIGO.ORG - posted 08:18, Friday 08 December 2017 - last comment - 14:42, Friday 08 December 2017(39689)
Shift Transition - Day

TITLE: 12/08 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 2mph Gusts, 1mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.40 μm/s
QUICK SUMMARY:

15:07 Vanessa and Karen into LVEA

15:29 Mark and Tyler into LVEA HAM5 (doors)

15:30 lost comms w/EX HEPI pump controller

 

Comments related to this report
patrick.thomas@LIGO.ORG - 14:42, Friday 08 December 2017 (39694)
Hugh walked me through the instructions in the wiki for restarting the end X HEPI EPICS IOC and recovering the PID.