- ITMy had its "pizza crust" FirstContact painted on the perimeter of the FC spray sheet that was applied last week.
- CPy had its FC painted on.
- CPx had its FC painted on.
- ITMy PUM cable ground loop fixed. Cable was routed through a pinch point in the Top Mass. The cable was moved out of the pinch point and the short was alleviated.
- BS Top Mass ground loop checks were started, but aborted until tomorrow until better access to the outside of the feedthrough can be established.
For tomorrow, we will need to swing the ITMy ACB back into its nominal location such that we can recover our only ACB swing back wedge (the second wedge we borrowed from LLO was returned earlier this month). Swing back ITMx ACB and apply spray FC and "pizza crust". Finish out BS ground loop checks and start ITMx ground loop checks.