Reports until 16:00, Thursday 14 December 2017
LHO General
patrick.thomas@LIGO.ORG - posted 16:00, Thursday 14 December 2017 (39770)
Ops Shift Summary
TITLE: 12/14 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

17:40 UTC Jeff B. and Kentaro to LVEA, working on camera
18:01 UTC Chandra reports purge air is back online
18:11 UTC Bubba and Apollo starting WP 7249
18:11 UTC Terry to squeezer bay, not turning laser on while Apollo is working at height
18:30 UTC Ed to LVEA to prep for IO work
18:49 UTC Kentaro back
19:09 UTC Christina to mid X
19:14 UTC Jeff B. back
19:43 UTC Betsy and Travis to BSC2
19:43 UTC TJ to TCS tables to add cables
19:44 UTC Karen to H2 building to clean
19:55 UTC Terry back
20:02 UTC Karen back
20:06 UTC TJ back
20:09 UTC Bubba done, ready to go to laser hazard
20:30 UTC Ed to LVEA
20:34 UTC Betsy and Travis back
20:38 UTC Peter transitioning LVEA to laser hazard
21:00 UTC Bubba, Marc, Tyler back
21:23 UTC Terry to squeezer bay, squeezer bay to laser hazard
21:35 UTC Betsy to optics lab
21:38 UTC Nutsinee to squeezer bay
21:39 UTC Gerardo to HAM4 to get part number from viewport covers
21:54 UTC TJ to TCS tables to finish cabling
22:09 UTC Hugh to HAM4 to unlock HEPI
22:27 UTC Jenne and Sudesh to look at ISC racks near PSL enclosure
22:30 UTC TJ back
22:35 UTC Tyler and Marc staging equipment near HAM4 for install
23:24 UTC Jenne and Sudesh back
23:36 UTC Marc and Tyler back