Reports until 16:12, Friday 15 December 2017
H1 General
patrick.thomas@LIGO.ORG - posted 16:12, Friday 15 December 2017 (39780)
Ops Shift Summary
TITLE: 12/16 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

15:20 UTC Mark and Tyler to LVEA to install NEG pump on output tube
15:32 UTC Bubba to LVEA to join Mark and Tyler
16:16 UTC Chris to LVEA to talk to Bubba
16:31 UTC Bubba back
16:36 UTC Chris back, will open LVEA high bay outer rollup door
16:36 UTC Richard out of LVEA
17:01 UTC Mark and Tyler back
17:26 UTC Richard to LVEA to retrieve tools from bier garten
17:34 UTC Richard back
17:51 UTC Richard and Filiberto to LVEA to test ESTOPs
17:55 UTC Peter transitioning LVEA to laser hazard
17:58 UTC Tractor delivery through gate for Bubba
Richard back
18:31 UTC Travis to bier garten to pack up equipment
18:38 UTC Filiberto back from LVEA, going to end Y to jumper EtherCAT safety block
18:46 UTC Terry to squeezer bay, squeezer bay to laser hazard
18:48 UTC Travis done
18:57 UTC Nutsinee to squeezer bay
19:06 UTC Filiberto going to end X to jumper EtherCAT safety block
20:43 - 20:50 UTC Elizabeth dropping off cables in CER
21:01 UTC Nutsinee back
21:11 UTC Ed and Yannick to HAM2 area to garb
21:14 UTC Travis, Mark and Tyler to LVEA to prep for moving equipment to end stations
21:23 UTC Bubba to end Y
21:23 UTC Betsy to HAM2
21:23 UTC Richard to LVEA to test Beckhoff laser safety interlock
21:32 UTC Travis, Mark and Tyler back
21:36 UTC Sheila, Betsy, Cheryl, Ed and Yannick in HAM2
21:56 UTC Bubba back
22:27 UTC Richard and Filiberto to LVEA
Richard back
23:01 UTC Filiberto back
23:09 UTC dust alarm in vacuum prep lab
23:25 UTC Travis to LVEA to take torque wrench to HAM2
23:36 UTC Travis back
23:36 UTC Terry to squeezer bay
23:47 UTC Nutsinee to squeezer bay
00:03 UTC Yannick back