TITLE: 12/16 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: 15:20 UTC Mark and Tyler to LVEA to install NEG pump on output tube 15:32 UTC Bubba to LVEA to join Mark and Tyler 16:16 UTC Chris to LVEA to talk to Bubba 16:31 UTC Bubba back 16:36 UTC Chris back, will open LVEA high bay outer rollup door 16:36 UTC Richard out of LVEA 17:01 UTC Mark and Tyler back 17:26 UTC Richard to LVEA to retrieve tools from bier garten 17:34 UTC Richard back 17:51 UTC Richard and Filiberto to LVEA to test ESTOPs 17:55 UTC Peter transitioning LVEA to laser hazard 17:58 UTC Tractor delivery through gate for Bubba Richard back 18:31 UTC Travis to bier garten to pack up equipment 18:38 UTC Filiberto back from LVEA, going to end Y to jumper EtherCAT safety block 18:46 UTC Terry to squeezer bay, squeezer bay to laser hazard 18:48 UTC Travis done 18:57 UTC Nutsinee to squeezer bay 19:06 UTC Filiberto going to end X to jumper EtherCAT safety block 20:43 - 20:50 UTC Elizabeth dropping off cables in CER 21:01 UTC Nutsinee back 21:11 UTC Ed and Yannick to HAM2 area to garb 21:14 UTC Travis, Mark and Tyler to LVEA to prep for moving equipment to end stations 21:23 UTC Bubba to end Y 21:23 UTC Betsy to HAM2 21:23 UTC Richard to LVEA to test Beckhoff laser safety interlock 21:32 UTC Travis, Mark and Tyler back 21:36 UTC Sheila, Betsy, Cheryl, Ed and Yannick in HAM2 21:56 UTC Bubba back 22:27 UTC Richard and Filiberto to LVEA Richard back 23:01 UTC Filiberto back 23:09 UTC dust alarm in vacuum prep lab 23:25 UTC Travis to LVEA to take torque wrench to HAM2 23:36 UTC Travis back 23:36 UTC Terry to squeezer bay 23:47 UTC Nutsinee to squeezer bay 00:03 UTC Yannick back