TITLE: 12/19 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 2mph Gusts, 1mph 5min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.24 μm/s
QUICK SUMMARY: Some work in the LVEA is already starting on this rainy day; Hugh investigating SEI BSC2 trips, Bubba Mark Tyler working on the neg pump, and Karen Vanessa making things spotless for us.