Ops Shift Log: 12/20/2017, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked - Vent
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Vent close out work in LVEA
Activity Log: Time - UTC (PT)
16:00 (08:00) Start of Shift
16:15 (80:15) Jenne, Jason, & Rick – to HAM2 for ISS array alignment
16:30 (08:30) Betsy – In the Optics Lab
16:52 (08:52) BSC1 & BSC3 door are on
16:52 (08:52) Filiberto – Checking on ISS array chassis
17:07 (09:07) Chris – Out of the LVEA
17:10 (09:10) Mark & Tyler – Out of the LVEA
17:20 (09:20) Richard – Going into the LVEA
17:26 (09:26) Terry – Going to the Squeezer Bay
17:44 (09:44) Karen & Vanessa – Cleaning the mid stations
17:55 (09:55) Filiberto & Liz – Pulling cables from CER to HAM6
18:02 (10:02) Sheila – Going to HAM2
18:07 (10:07) Richard – Going to LVEA for ISS array alignment
18:44 (10:44) Karen & Vanessa – Finished cleaning at the out buildings
18:45 (10:45) Hugh & Brijesh – Going to the LVEA for start bring up the HEPI system
19:08 (11:08) Tyler & Mark – Going to End-Y to prep for vent
19:13 (11:13) Ed – Going to HAM2 for ISS array work
19:18 (11:18) Hugh & Brijesh – Out of the LVEA
19:23 (11:23) Ed – Out of the LVEA
19:32 (11:32) Richard – Going to LVEA to confer with Filiberto
19:41 (11:41) Richard – Back form LVEA – He also toggled the noise eater
20:09 (12:09) Richard – In LVEA with Filiberto
20:11 (12:11) Filiberto & Liz – Out of the LVEA
20:27 (12:27) Sheila, Jason, & Rick – Out of LVEA
20:51 (12:51) Filiberto & Liz – Pulling cables from CER to HAM6
20:24 (12:24) Richard – Going into LVEA to open the PSL shutter – LVEA was already Laser Hazard
21:02 (13:02) Dave – At End-Y to move card in FE computer for timing glitch – WP #7252
21:33 (13:33) Nutsinee & Terry – Going to the Squeezer Bay
21:40 (13:40) Greg & Tvo – Join HWS table to HAM4 viewports – WP #7253
22:00 (14:00) Richard – Transition LVEA to Laser Safe
22:05 (14:05) Mark & Tyler – Moving vent equipment to End-Y
22:13 (14:13) Betsy & Travis – Going to HAM2 and HAM3
22:13 (14:13) Richard – Going into LVEA
22:09 (14:09) Hugh – Gong to HAM2/3 to prep for putting doors on
23:35 (15:35) Hugh – Out of the LVEA
00:00 (16:00) End of shift