The channels of the ASAIR LSC PDs were removed from the h1omc and h1lsc models. In the process a mistake with the OMC PZT readback channels was discovered. The DAQ channel list showed only 2 channels being hooked up, whereas in reality four channels are used. These 2 additional channels were intended for the CLF REFL RF6 readbacks. Issued ECR E1700426 to fix this. The LSC REFL and IMC CM board readbacks are now routed thru the ADC concentrator which inserts the CLF REFL channels into the two unused channels. This required a reconfiguration of the concentrator and a few reconnections in the ISC-C1 rack, as well as a change ot the h1sqz model.