Reports until 16:25, Sunday 24 December 2017
H1 AOS
kyle.ryan@LIGO.ORG - posted 16:25, Sunday 24 December 2017 - last comment - 16:58, Sunday 24 December 2017(39901)
1620 hrs. local -> Kyle on site
1625 hrs. local -> Checking standalone pumps in LVEA.  Expect to be here 30 minutes.  Will make Comment to this entry when leaving
Comments related to this report
kyle.ryan@LIGO.ORG - 16:58, Sunday 24 December 2017 (39902)
Standalone pumps carts etc. - a-OK (turned on HAM1,2 and 3 AIP controllers - all on scale).  Purge air measured -43C -> valved-in at OMC and decoupled flex line at IMC purge-air connection such that flow is into VE at OMC purge-air connection then out of VE at IMC purge-air connection (dry air exchange, using C3 hood as filter at outlet to prevent bugs entering VE in the case of a loss of pressurized purge-air).  

AIP currents slow to get started at BSC1 and BSC3 but now are typical (all good - see attached graphs).  BSC2 AIP is off but I won't climb up to connect turbos etc. without WP and buddy.  Will have to wait until Tuesday but shouldn't be any issue recovering BSC2 AIP as non of its flanges were cycled.  

1705 hrs. local - > Kyle leaving site now.  