We valved in both QDP80 roughing pumps at 3:45 pm local today. Pressure is currently at 480 Torr on PT-120A. We will leave the pumps valved in tonight while we're in viscous flow. We verified both safety valves close upon pump failure. HAM 1 is also being roughed out via scroll pump and will stay valved in over night. PT-100A is currently at 416 Torr. Kyle and I have agreed to check pressures from home every hour and log results.
We are both leaving site now.