HAUX: optic FC and more
[Betsy, David F, Filiberto, Giacomo]

Friday we have completed a few operation to get ready for starting HAUX testing on monday:
- the old FC has been removed from the install optics and new one has been applied, covering the entire HR face and about 50% (diameter) of the AR face. No peek tab. The FC used is supposed to be red, but so light that it appears almost clear when applied in a layer. However, it belongs to the last shipment of FC sent to Betsy by Margot, so should be good. The spare optics were left untouched.
- the HAUX were wrapped in foil, double bagged (we decided not to use any barrel) and moved from the staging building to the chamber-side cleanroom in the LVEA, awaiting optic installation on Monday.
- the MEDM model has been checked, BURT restored and the filters installed: it seems to work fine (for what we can tell without OSEMs attached) and it now has the same setting as the one at LLO.
- field cables where laid between sat-maps and chamber-side cleanroom, but we ended up not having time to connect anything to them. Binary I/O is not yet enabled (will be on Monday).