Ops Shift Log: 01/02/2018, Day Shift 16:00 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Unlocked – Vented for upgrades
Intent Bit: Engineering
Support: N/A
Incoming Operator: N/A
Shift Summary: Closing out vent work in CS. Shifting focus towards end stations
Activity Log: Time - UTC (PT)
16:00 (08:00) Take over from the holiday
16:20 (08:20) Terry – Going to Squeezer Bay
16:34 (08:34) Filiberto – Working on Squeezer cabling in CER and LVEA
17:04 (09:04) Richard – Going to CER and LVEA for Squeezer cabling
17:21 (09:21) Christina – Going to End-Y
17:22 (09:22) Karen & Vanessa – Going to End-Y
17:35 (09:35) Filiberto – Done with Squeezer cabling
17:40 (09:40) Filiberto & Liz – Working on cabling for HWS near HAM4
17:40 (09:40) Nutsinee – Going into Optics Lab
17:41 (09:41) Jim & Hugh – Going to unlock HAM2
17:51 (09:51) Corey – Going to clean up around HAM3
17:54 (09:54) Ed – Going to assist with cabling at HWS
18:00 (10:00) Norco on site for N2 delivery to CP2
18:02 (10:02) Richard – Going to LVEA to talk with Filiberto
18:04 (10:04) Corey – Out of the LVEA
18:19 (10:19) Richard – Out of the LVEA
18:22 (10:22) Karen & Vanessa – Finished at End-Y
18:23 (10:23) TJ – Going to assist Filiberto with HWS near HAM4
18:36 (10:36) Corey – Going to Squeezer bay
18:48 (10:48) Chris – Going to Mid-X to work on fan door
18:50 (10:50) Marc – Going to CER
18:50 (10:50) Corey – Out of Squeezer bay
18:54 (10:54) TJ – Out of the LVEA
19:14 (11:14) Nutsinee – Out of Optics Lab
19:22 (11:22) Sheila – Going into Optics Lab
19:27 (11:27) Nutsinee – Going into Optics Lab
19:43 (11:43) Greg – Going to CO2 table – No laser work
20:35 (12:35) Filiberto – Going into the CER
20:47 (12:47) Ed – Going to the HAM6/Squeezer area to pull cables
20:28 (12:48) Liz – Cabling between HAM4 and HAM5
21:05 (13:05) Richard & Marc – Replace Triple Top Coil Driver in CER
21:20 (13:20) Cheryl – Going to LVEA to look at more viewport/camera setups
21:26 (13:26) Chris – Maintenance work in the LVEA
21:34 (13:34) Marc & Richard – Finished with Coil Driver install
21:35 (13:35) Mark – Going into the LVEA
21:53 (13:53) Richard – Going into the LVEA to talk to D. Sigg
21:55 (13:55) Nutsinee – Going to Squeezer Bay then to Optics Lab
22:00 (14:00) Richard – Out of the LVEA
22:03 (14:03) Chris – Finished in the LVEA
22:13 (14:13) Hugh – Going to HAM5/6 area
22:37 (14:37) Richard – Going into LVEA to look at camera mounts
22:46 (14:46) Richard – Out of the LVEA
22:53 (14:53) Hugh & Jim – Out of the LVEA
23:16 (15:16) Marc – Going to assist with cable pulling on output arm
23:58 (15:58) Ed - Out of the LVEA
00:00 (16:00) End of shift