~9:30 - 10:16: Michael R. to mid Y, end Y, check on laser safety signs 10:18: HAM 4 door installed Monthly Hanford Emergency Testing phone alert Hugh, Eric: HEPI work Filiberto: Cabling near HAM 1,2 Rerouting of cable for dust monitor at location 8 in the LVEA (in clean room for suspension assembly near HAM 3) required brief disconnection of the dust monitor. Work permits: Bubba: Install north door on HAM 4, this will be with 4 bolts only to hold door in place. Doug: Install pipe bridge table at BSC2/HAM3. Hugh: Crane canned ISI west next to clean room. Remove lid, roll clean room over. Extract cabling & maybe GS-13s. Reverse. Richard: Install sleeves in conduits between MSR and LVEA. This requires removal of existing wiring, pulling new duct work in then reinstalling fibers.