Displaying report 1-1 of 1.
Reports until 08:00, Wednesday 03 January 2018
LHO General
thomas.shaffer@LIGO.ORG - posted 08:00, Wednesday 03 January 2018 (39960)
Ops Day Shift Transition

TITLE: 01/03 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 5mph Gusts, 4mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.47 μm/s
QUICK SUMMARY: Plans for today include prep for EY vent and CS commissioning health check, SEI HEPI unlocking and EY locking, getting TCS/HWS back online, and CDS still pulling cables.

Displaying report 1-1 of 1.