TITLE: 01/03 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Starting to hook up the tables and cables from the CS vent, and prep at EY for its vent. SEI crew is has been working on HEPI at HAM4 and EY. Jeff K has ran measurements and cleared all of the large suspensions in HAM2/3 (ie. MC's & PR's). We will be going laser hazard shortly and commissioning work will begin on the IMC.
LOG:
- 15:10 Bubba, Mark, Tyler to LVEA to place IOT2 table and light pipes on
- 16:14 Terry to SQZr Bay, local laser hazard
- 16:28 Richard in and out of LVEA working on EE stops
- 16:31 Bubba out
- 16:42 Marc to LVEA to dress and pull cables.
- 16:46 Fil, ED to LVEA pulling cables near HAM6/SQZr Bay
- 17:02 Jason to LVEA to check on light pipe status before turning on the PSL
- 17:05 Jason out
- 17:08 Mark, Tyler out
- 17:12 TVo to LVEA to HWS table
- 17:18 Mark, Tyler back to HAM2 area
- 17:21 Nutsinee to SQZr Bay
- 17:35 Corey to Optics Lab
- 17:37 Mark, Tyler out and IOT2 is hooked up and in place
- 17:45 Karen to warehouse then MY
- 17:49 Elizabeth to LVEA to HAM6/SQZr Bay area to help with cables
- 17:53 Marc out
- 17:55 Hugh, Jim to LVEA to unlock BSC1&3
- 18:08 Bubba to MX
- 18:23 Christina to MX
- 18:37 Nutsinee out
- 19:10 Hugh, Jim out
- 19:13 Jenne, Keita to LVEA to look for barriers
- 19:14 TVo out, ITMX HWS somewhat aligned
- 19:17 Karen leaving MY
- 19:17 Jason to LVEA to check on PSL racks
- 19:52 Keita, Jenne to LVEA to start setting up laser barrier around HAM1/2
- 19:55 Fil, Ed, Elizabeth out
- 20:08 Keita, Jenne out
- 20:09 Jason out
- 20:49 Fil to LVEA to hook up IOT2L
- 21:02 Ed to LVEA to join Fil
- 21:90 Richard, Mark, Tyler to LVEA to move garbing room.
- 21:10 Hugh, Jim to EY
- 21:15 TVo to LVEA to HWS table
- 21:19 Elizabeth to LVEA to meet with Fil, Ed
- 21:21 Tyler, Mark out
- 21:38 Jenne, Niko to LVE to finish laser barrier
- 21:50 Greg to LVEA to start up chillers and look for leaks
- 21:52 Jason to LVEA to PSL racks
- 22:01 Jenne, Niko out
- 22:19 Keita to optics lab
- 22:42 Keita out
- 23:05 Mark, Tyler to EY to set up cleanroom
- 23:16 Cheryl to PSL to replace some electronics
- 23:21 Jason to LVEA to remove lock from PSL rotation stage (WP#7263)
- 23:23 Jason out
- 23:26 Hugh to HAM4 HEPI inspection
- 23:49 Nutsinee out
- 23:58 Mark, Tyler out
- 00:03 Hugh out