Reports until 16:00, Wednesday 03 January 2018
H1 PSL
jason.oberling@LIGO.ORG - posted 16:00, Wednesday 03 January 2018 (39968)
PSL Restarted After Holiday Break + Weekly FAMIS Tasks

Today I restarted the PSL after it was purposefully shutdown for the duration of the holiday break.  The HPO and 35W FE restarted with no issues, but I did run into an issue while injection locking the two lasers; the injection locking was very unstable.  To ensure the system was at thermal equilibrium I let it warm up for the morning and roughly half of the afternoon before investigating the instability.  By 20:00 UTC (12:00 PST) the injection locking had become more stable, but was still having occasional relocks.  I lowered the ILS gain voltage from 1.0 V to 0.5 V (this is actually a gain increase) and things became more stable.  I also noticed that the SR560 used to boost the low frequency gain of the ILS servo was saturated; I could not get it to clear at the time.  Checking on things again at 22:00 UTC (14:00 PST), the injection locking had stabilized further.  As a double check I looked at the PDH error signal for the injection locking and saw no issues there; this required me to unlock the ILS to see the error signal.  Upon relocking the ILS things looked much more stable, and at about this time I also noticed that the SR560 was no longer saturating.  I turned on the TFIN for the ILS (the signal path we use to boost the ILS low frequency gain) and the signals looked much better.  I left it in that state to continue to warm up for the rest of the afternoon.  As of 23:54 UTC (15:54 PST), the system looked stable and operating normally.  At this point in time I re-enabled the power watchdogs.

I re-enalbed the PMC, FSS, and ISS at ~23:00 UTC (~15:00 PST).  All 3 came back without issue.  I will continue to monitor the system, but as of right now everything appears to be running normally.

 

I also took this opportunity to do the weekly PSL FAMIS tasks during the morning.

HPO Pump Diode Current Adjustment (FAMIS 8455)

With the ISS still OFF, I adjusted the pump diode operating currents and temperatures this morning as part of the PSL restart.  The changes are summarized in the below tables and a screenshot of the PSL Beckhoff main screen is attached for future reference.

HPO Pump Diode Currents
  Operating Current (A)
Old New
DB1 53.7 53.9
DB2 55.4 55.6
DB3 55.4 55.6
DB4 55.4 55.6

 

HPO Pump Diode Temperatures
  Operating Temperatures (°C)
DB1 DB2 DB3 DB4
Old New Old New Old New Old New
D1 26.5 26.0 19.5 20.0 20.5 21.0 22.0 21.5
D2 26.5 26.0 19.0 19.5 24.5 25.0 19.5 19.0
D3 26.5 26.0 20.0 20.5 24.5 25.0 21.0 20.5
D4 26.5 26.0 18.0 18.5 21.5 22.0 19.5 19.0
D5 26.5 26.0 18.0 18.5 25.5 26.0 21.5 21.0
D6 26.5 26.0 18.5 19.0 20.0 20.5 21.5 21.0
D7 26.5 26.0 19.0 19.5 21.0 21.5 21.5 21.0

At the time of adjustment the HPO was outputting ~154.5 W; this was at roughly 18:30 UTC (10:30 PST).  This completes FAMIS 8455.

PSL Power Watchdog Reset (FAMIS 4586)

I turned on both PSL power watchdogs at 23:54 UTC (15:54 PST).  This completes FAMIS 4586.

 

Images attached to this report