Reports until 16:00, Friday 05 January 2018
LHO General
thomas.shaffer@LIGO.ORG - posted 16:00, Friday 05 January 2018 (40006)
Ops Day Shift Summary

TITLE: 01/05 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Back to laser Hazard in the LVEA. CDS cabling work continues and so does IMC work.
LOG: (See attached for long log)

 