Reports until 08:09, Friday 05 January 2018
LHO General
thomas.shaffer@LIGO.ORG - posted 08:09, Friday 05 January 2018 (40007)
Ops Day Shift Transition

TITLE: 01/05 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 1mph Gusts, 0mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.37 μm/s
QUICK SUMMARY: HAM5 HAM6 South door removal has started. Bubba transitioned the LVEA to SAFE earlier this morning.