Started EY vent at 11:30 am local. Currently at 1.5 Torr; purge air valved out till after lunch. I needed to reboot local Beckhoff computer because of screen freezing up, which caused CC gauges to trip and CP7 PID settings to default to values of zero. Gerardo did a BURT restore.
Purge air DP measures -46degC.
(Patrick, Gerardo)
Burtrestored h0vacey to 9:00.