Jim Mitchell Greg Hugh Per work permit, the canned ISI#3 was craned west close to the East Test Stand Cleanroom. The can was cleaned, the lid removed and the cleanroom rolled over. Cables, wall mass, and GS-13s were removed; this assembly was completed before cable plans were finalized and before there was a LIGO India. The walls have been replaced and the ISI is ready for closing back up in the can.