Reports until 07:32, Tuesday 28 August 2012
H2 SEI
hugh.radkins@LIGO.ORG - posted 07:32, Tuesday 28 August 2012 (4005)
HAM ISI Assembly #3 in Storage Can Stripped of Sensors, Cables & Wall Mass
Jim Mitchell Greg Hugh
Per work permit, the canned ISI#3 was craned west close to the East Test Stand Cleanroom.  The can was cleaned, the lid removed and the cleanroom rolled over.  Cables, wall mass, and GS-13s were removed; this assembly was completed before cable plans were finalized and before there was a LIGO India.  The walls have been replaced and the ISI is ready for closing back up in the can.