Displaying report 1-1 of 1.
Reports until 15:59, Wednesday 10 January 2018
LHO General
patrick.thomas@LIGO.ORG - posted 15:59, Wednesday 10 January 2018 - last comment - 16:29, Wednesday 10 January 2018(40085)
Ops Shift Summary
TITLE: 01/10 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

15:41 UTC Mark and Tyler to LVEA
16:15 UTC Terry to squeezer bay, turning laser on, laser hazard at height
16:22 UTC Vanessa and Karen leaving end Y
16:29 UTC Reset BS HEPI WD
16:30 UTC Mark and Tyler out of LVEA, to end Y for BSC arm installation
16:47 UTC Jenne in CR working on IMC, need HAM2,3
16:50 UTC Daniel and Ed pulling squeezer chassis 1 and 2 in CER
17:02 UTC Jeff B. to cleaning area
17:17 UTC Travis to end Y to help with BSC arm installation
17:22 UTC Gerardo and Bubba to LVEA to plug HAM6 annulus
17:22 UTC Jeff B. back
17:26 UTC Filiberto to mezzanine to connect TCS laser to Beckhoff safety system
17:36 UTC Betsy to end Y
17:42 UTC Visitor through gate to see Chandra
17:48 UTC Gerardo and Bubba done. Aux pump cart left pumping on annulus system for HAM5,6
18:04 UTC Ed done in CER
18:12 UTC Gerardo to mid Y to prep for CP5 ion pump install
18:27 UTC Keita to end stations to post ALS laser SOPs
18:33 UTC Betsy back from end Y
18:39 UTC Daniel and Sheila in squeezer bay
18:49 UTC Filiberto and Elizabeth to HAM5,6 to pull squeezer cabling
18:50 UTC Betsy to LVEA to get part to take to end Y
19:22 UTC Keita done posting ALS laser SOPs
19:40 UTC Jim to end Y to lock ISI
19:41 UTC Karen to H2 building
19:42 UTC Filiberto done, had unplugged SRM top suspension cable
19:50 UTC Marc and Ed to CER to find lid
19:55 UTC Marc and Ed back, to H2 building to find lid
20:00 UTC Marc and Ed back, taking lid to CER
20:03 UTC Ed and Marc done
20:03 UTC Travis back. BSC arm is on. Jim locking ISI.
20:34 UTC Filiberto to LVEA squeezer racks
20:40 UTC Elizabeth to mid Y
20:47 UTC Sheila, Daniel, Terry, Nutsinee out of squeezer bay for lunch
21:10 UTC Karen to end Y then mid Y
21:20 UTC Jason to end Y
21:26 UTC Dave restarted h1sqz model for Daniel's changes. This will also load Sheila's modified filter file.
21:33 UTC Chandra and Kyle closing GV 11,12 WP 7269
21:34 UTC Gerardo to HAM6
21:35 UTC Jeff B. to optics lab to put equipment away
21:39 UTC Dave shutting down h1seiex
21:46 UTC Jeff B. back
21:48 UTC Jason to end Y
21:50 UTC Elizabeth back, going to LVEA
21:50 UTC Gerardo back, going to mid Y
21:52 UTC Dave and Jim powered down all analog at end X, have rollup door open
21:53 UTC Marc to end Y
21:58 UTC Hugh toggling HAM5 ISI to damped/isolated
22:12 UTC Dave and Jim back from end X
22:13 UTC Betsy to cleaning area to get C3 covers
22:19 UTC Rick and Travis to end Y to do PCAL in chamber work, Rick transitioning end Y to laser hazard
22:20 UTC Karen and Vanessa leaving mid Y
22:26 UTC Jenne and Cheryl to PSL for ISC alignment
22:44 UTC Robert to end Y to take pictures in chamber with PCAL group
22:48 UTC Elizabeth and Filiberto done in LVEA
23:00 UTC Site weekly meeting
23:18 UTC Jenne and Cheryl back
23:42 UTC Robert back from end Y
23:44 UTC Tyler and Mark done at end Y
23:50 UTC Rick transitioning end Y to laser hazard
Comments related to this report
patrick.thomas@LIGO.ORG - 16:29, Wednesday 10 January 2018 (40087)
00:00 - 00:26 UTC Peter K. to IO tables.
Displaying report 1-1 of 1.