(Chandra, Gerardo)
Hard closed GV11 and GV12, this was done in preparation for CP4 bake, at 23:03 utc a small 75 l/s ion pump was coupled to CP4 vacuum volume to remove H2.
Something to note, during the closing of the gate valves, GV11 made a loud noise, visible on some of the local seismometers, also the annulus system for this gate valve responded by going up on current, went from 1 light to 6 lights. GV12 did not make any noise and its annulus system did not show any changes.
To couple the new ion pump to CP4 we followed the steps listed on WP#7270.
We suspect the sharp step in pressure is from a voltage change in CC gauge when disengaging switches at valve gate pins (for LOTO).