TITLE: 01/11 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: Corey covering from 22:00 UTC to 23:00 UTC Operator meeting at 23:00 UTC (no coverage) 15:07 UTC Chris to LVEA to retrieve clean and bake items for Betsy 15:56 UTC Mark and Tyler to LVEA to retrieve equipment for Rick. Craning equipment over beam tube. 16:28 UTC Mark and Tyler done 16:45 UTC Bubba to end Y 16:48 UTC Gerardo to LVEA to check on aux pump cart by HAM5 16:55 UTC Ed to LVEA to stage cable for WP 7279 17:09 UTC Gerardo back 17:16 UTC Mark and Tyler to end Y to retrieve equipment through outer rollup door 17:16 UTC Jeff B. starting WP 7280 17:18 UTC Ed and Filiberto starting WP 7279 17:39 UTC Bubba back from end Y 18:13 UTC Bubba to LVEA to look for legs for scaffolding 18:19 UTC Bubba back 18:20 UTC Marc to LVEA to look for Filiberto 18:26 UTC Mark and Tyler done at end Y 18:42 UTC Chandra to mid Y and end Y to check on things 19:07 UTC Ed and Filiberto done pulling cables. Ed making pigtails. Cables need to be terminated. Filiberto starting connection of TCS laser to safety system on mezzanine. 19:08 UTC Travis to optics lab to get IR viewer then cleaning area to get headsets. 19:12 UTC Gerardo to LVEA to turn off aux pump cart by HAM5 19:18 UTC Jeff B. out of LVEA 19:19 UTC Travis back Gerardo back 19:32 UTC Cheryl to IOT2L to install beam block 19:43 UTC Yannick to LVEA to take pictures of PEM devices 19:56 UTC Betsy to LVEA to drop off wipes 19:59 UTC Jenne to join Cheryl at IOT2L table 20:04 UTC Betsy back 20:09 UTC Yannick back 20:45 UTC Jenne and Cheryl back 20:52 UTC Jeff K. taking transfer function on ITMY reaction chain 20:55 UTC Rick, Travis, Evan, Darkhan to end Y for PCAL 21:00 UTC Vent meeting in CR 21:03 UTC PCAL group transitioning end Y to laser hazard 21:37 UTC Ed and Filiberto to LVEA to continue cable pulling 21:54 UTC Bubba transitioning LVEA to laser hazard