TITLE: 01/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Planned Engineering LOG: 15:27 UTC Hugh to HAM2, looking for Mark and Tyler 15:35 UTC Hugh back 15:57 UTC Hugh starting an excitation on end X HEPI 16:11 UTC Christina and Vanessa to end Y 16:43 UTC TJ to optics lab 16:43 UTC Hugh, Mark and Tyler to HAM2 to install scaffolding (WP 7281) 16:47 UTC Christina and Vanessa leaving end Y 16:57 UTC Christina and Vanessa to LVEA to clean 17:19 UTC Filiberto to mezzanine to connect TCS to Beckhoff safety interlock 17:20 UTC Robert to LVEA to look at damaged panel in IOT2L 17:25 UTC Robert back 17:30 UTC Gerardo to LVEA, isolate pump on top of HAM5 and 6 17:43 UTC TJ back 17:56 UTC Hugh to HAM2 to check on scaffolding work 18:01 UTC Chandra to mid Y and end Y 18:04 UTC Fire department through gate, touring site 18:05 UTC Gerardo back 18:10 UTC Mark and Tyler back 18:15 UTC Fire department off site 18:23 UTC Travis and Betsy to end Y 18:25 UTC Cheryl to HAM3, WP 7284 18:46 UTC Mark and Tyler back to HAM2 18:49 UTC Greg starting WP 7285 19:09 UTC Nutsinee and Daniel to squeezer bay 19:34 UTC Gerardo to mid Y to replace VEA camera 19:39 UTC Daniel and Nutsinee back 19:56 UTC Greg and TJ to LVEA to install laser enclosure panels around TCSY table 19:58 UTC Mark and Tyler back 20:07 UTC Gerardo back 20:15 UTC Betsy and Travis back 20:15 UTC TJ back 20:36 UTC Mark to HAM5 to tighten door bolts 20:36 UTC Greg done 20:39 UTC Peter to PSL racks to remove a power supply 20:44 UTC Peter done 20:56 UTC Cheryl to IOT2L to adjust cameras on table 20:56 UTC Filiberto done adding TCS laser to safety system. Going to install power supply that Peter removed in the CER. 21:04 UTC Sheila to LVEA 21:12 UTC Hugh to HAM2 to look at scaffolding 21:18 UTC Hugh back 21:35 UTC Mark done 21:40 UTC Filiberto done in CER. Going back to cabling in LVEA. 21:42 UTC Gerardo to mid Y with camera 21:45 UTC Keita to IOT2L 21:46 UTC Darkhan and Yannick to end Y, PCAL work, transitioning to laser hazard 21:57 UTC Darkhan transitioning end Y to laser hazard 22:02 UTC Gerardo back 22:03 UTC Terry to squeezer bay 22:13 UTC Marc to CER 22:57 UTC Nutsinee to squeezer bay 23:04 UTC Dave restarting h1sqz model 23:05 UTC Darkhan and Yannick back. end Y back to laser safe. 23:08 UTC Nutsinee back 23:29 UTC Sheila and Nutsinee to squeezer bay 23:47 UTC Chandra to mid and end Y