Reports until 16:08, Friday 12 January 2018
LHO General
patrick.thomas@LIGO.ORG - posted 16:08, Friday 12 January 2018 (40124)
Ops Shift Summary
TITLE: 01/12 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
LOG:

15:27 UTC Hugh to HAM2, looking for Mark and Tyler
15:35 UTC Hugh back
15:57 UTC Hugh starting an excitation on end X HEPI
16:11 UTC Christina and Vanessa to end Y
16:43 UTC TJ to optics lab
16:43 UTC Hugh, Mark and Tyler to HAM2 to install scaffolding (WP 7281)
16:47 UTC Christina and Vanessa leaving end Y
16:57 UTC Christina and Vanessa to LVEA to clean
17:19 UTC Filiberto to mezzanine to connect TCS to Beckhoff safety interlock
17:20 UTC Robert to LVEA to look at damaged panel in IOT2L
17:25 UTC Robert back
17:30 UTC Gerardo to LVEA, isolate pump on top of HAM5 and 6
17:43 UTC TJ back
17:56 UTC Hugh to HAM2 to check on scaffolding work
18:01 UTC Chandra to mid Y and end Y
18:04 UTC Fire department through gate, touring site
18:05 UTC Gerardo back
18:10 UTC Mark and Tyler back
18:15 UTC Fire department off site
18:23 UTC Travis and Betsy to end Y
18:25 UTC Cheryl to HAM3, WP 7284
18:46 UTC Mark and Tyler back to HAM2
18:49 UTC Greg starting WP 7285
19:09 UTC Nutsinee and Daniel to squeezer bay
19:34 UTC Gerardo to mid Y to replace VEA camera
19:39 UTC Daniel and Nutsinee back
19:56 UTC Greg and TJ to LVEA to install laser enclosure panels around TCSY table
19:58 UTC Mark and Tyler back
20:07 UTC Gerardo back
20:15 UTC Betsy and Travis back
20:15 UTC TJ back
20:36 UTC Mark to HAM5 to tighten door bolts
20:36 UTC Greg done
20:39 UTC Peter to PSL racks to remove a power supply
20:44 UTC Peter done
20:56 UTC Cheryl to IOT2L to adjust cameras on table
20:56 UTC Filiberto done adding TCS laser to safety system. Going to install power supply that Peter removed in the CER.
21:04 UTC Sheila to LVEA
21:12 UTC Hugh to HAM2 to look at scaffolding
21:18 UTC Hugh back
21:35 UTC Mark done
21:40 UTC Filiberto done in CER. Going back to cabling in LVEA.
21:42 UTC Gerardo to mid Y with camera
21:45 UTC Keita to IOT2L
21:46 UTC Darkhan and Yannick to end Y, PCAL work, transitioning to laser hazard
21:57 UTC Darkhan transitioning end Y to laser hazard
22:02 UTC Gerardo back
22:03 UTC Terry to squeezer bay
22:13 UTC Marc to CER
22:57 UTC Nutsinee to squeezer bay
23:04 UTC Dave restarting h1sqz model
23:05 UTC Darkhan and Yannick back. end Y back to laser safe.
23:08 UTC Nutsinee back
23:29 UTC Sheila and Nutsinee to squeezer bay
23:47 UTC Chandra to mid and end Y