Reports until 16:04, Tuesday 16 January 2018
H1 General
edmond.merilh@LIGO.ORG - posted 16:04, Tuesday 16 January 2018 (40132)
Shift Summary - Day

TITLE: 01/17 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: MAINTENANCE DAY


LOG:

All times marked in UTC:

17:23 Bubba and Mark into LVEA for rigging in preparation for scaffold assembly

17:46 Coca-Cola on site

17:55 Bubba and Mark out

16:00 Jeff to cleaning area and LVEA

16:05 Terry out to squeezer bay

16:30 Pest control on site. Chris escorting them into LVEA.

16:40 Jeff out of LVEA

16:45 Chris escorting pest control down the Y arm to out stations

17:00 Terry out for vent meeting

17:05 Chandra out going to EY

17:15 Norco with LN2 going to vessel ending in 77

17:55 Corey out to Optics Lab

18:00 Terry back out to squeezer bay. Nutsinee, as well.

18:03 Jim and Hugh out to EY to work on HEPI pumps

18:10 Resetting BSC watchdogs tripped from recent earthquakes

18:16 Keita out to floor checking cabling on IO2TL; Sheila taking IMC open loop meaurements; Cheryl is addressing cameras

18:17 Mark and Tyler out to HAM2 to assess the newly installed catwalk and address access options

18:20 Jenne out to join Sheila Keita and Cheryl

18:22 TJ out to optics lab

18:22 Marc to CER to investigate AS WFS read-backs WP#7294

18:23 Travis out to Biergarten

18:35 Mark and Travis out

18:41 Pest control is done

18:53 Mark and Tyler to EY

19:07 Corey out of the optics lab

19:19 Jim and Hugh back from EY

19:21 Sheila out

19:39 Jenne out to IO2TL

19:40 Chandra out to LVEA

21:03 Jeff B out to both end stations - mechanical rooms

21:10 Nutsinee out to squeezer bay

21:22 Betsy and Travis out to Mid-X

21:27 Karen out to the optics lab

21:29 TJ bac out to optics lab

21:29 Jenne out to IO2TL

21:40 Betsy and Travis out to EX

22:06 Marc out

22:30 Sheila out to LVEA with Jenne

22:42 Hugh back

22:46 Chris headed back to corner from EX

23:26 Marc to MY