Reports until 15:59, Wednesday 24 January 2018
H1 General
edmond.merilh@LIGO.ORG - posted 15:59, Wednesday 24 January 2018 (40245)
Shift Summary -Day

TITLE: 01/24 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

16:13 Terry out to squeezer bay

16:18 Karen and Vanessa out to EY to clean

16:39 Fil out to HAM2 area - camera images not getting into cr

17:00 Vanessa and Karen back from EY

17:10 Mark and Tyler out to MX to retrieve magnets

17:12 Travis, Danny, Angus and Karl (welding crew) out to EY

17:20 Jason out to PSL enclosure.

17:27 Karen and Vanessa cleaning in LVEA

17:30 Marc out to LVEA - ZM work at output arm

17:31 Fil out

17:51 Jeff B heading out to PSL enclosure - leak in chiller manifold

18:10 Jason back from PSL enclosure and out to EY for Fiber Welding.

10:32 Sheila out to optics lab

19:06 Mark and Tyler back  and out to LVEA - moving ION pump

19:08 Peter going out to PSL enclosure - to secure environmental controls after leak repair is done

20:00 Welding crew and Sheila back and out for lunch

20:30 Peter ad Jeff B out to ITMX - camera

21:05 Peter and Jeff back

22:00 Site Meeting