Reports until 16:27, Wednesday 29 August 2012
LHO VE
kyle.ryan@LIGO.ORG - posted 16:27, Wednesday 29 August 2012 (4027)
(2) 16.5" feedthrough assemblies removed from BSC1
Kyle, Gerardo (initial)

The two leaking 16.5" feedthrough assebmlies were removed from BSC1.  A custom bracket was fabricated and utilized which allowed the assemblies to be removed with the crane (as a whole unit).    

NOTE:  Ports are covered in UHV foil but BSC1 is not within a cleanroom and is reliant on properly adjusted purge air - please don't adjust the Vertex Volume's purge air.