Reports until 16:00, Thursday 25 January 2018
H1 AOS
edmond.merilh@LIGO.ORG - posted 16:00, Thursday 25 January 2018 (40271)
Shift Summary - Day

TITLE: 01/25 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:

16:03 Christina out to LVEA

16:45 Hugh out to LVEA - working atop HAM6

16:50 Set Very Large EQ button because of 5.8mag of the coast of N Cali

16:53 reset ACT SEI trip at ETMX

16:57 reset MC1 wd,  HAM2 ISI CPS trip, and ITMY ACT trip. The latter has been problematic this morning.

18:03 Jeff K out to LVEA - talk to Hugh on top of HAM6

18:04 N out to squeezer bay

18:13 Marc out to LVEA - check on ZM1; pull TTFS unit from squeezer bay.

18:22 Betsy Tj Jeff K and Jim out to EY - B&K Hammer and Reaction chain

18:27 Sheila ou to optics lab

18:29 Travis called from EY - the welding team is out there (Danny, Angus and him)

19:43 Noticed Fil out on LVEA floor at output.

21:32 Richard into CER - HV supplies

21:36 Marc out to LVEA - SUS rack by HAM5

21:50 Sheila out to optics lab

21:54 Betsy out to EY

22:04 Jim and TJ out to EY

22:45 Kissel back

22:53 Marc back

23:13 Kyle out to MY and EY

23:38 Jeff B out

23:59 Greg out to TCSY table to reset the LASER

24:00 EOS