TITLE: 01/25 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
16:03 Christina out to LVEA
16:45 Hugh out to LVEA - working atop HAM6
16:50 Set Very Large EQ button because of 5.8mag of the coast of N Cali
16:53 reset ACT SEI trip at ETMX
16:57 reset MC1 wd, HAM2 ISI CPS trip, and ITMY ACT trip. The latter has been problematic this morning.
18:03 Jeff K out to LVEA - talk to Hugh on top of HAM6
18:04 N out to squeezer bay
18:13 Marc out to LVEA - check on ZM1; pull TTFS unit from squeezer bay.
18:22 Betsy Tj Jeff K and Jim out to EY - B&K Hammer and Reaction chain
18:27 Sheila ou to optics lab
18:29 Travis called from EY - the welding team is out there (Danny, Angus and him)
19:43 Noticed Fil out on LVEA floor at output.
21:32 Richard into CER - HV supplies
21:36 Marc out to LVEA - SUS rack by HAM5
21:50 Sheila out to optics lab
21:54 Betsy out to EY
22:04 Jim and TJ out to EY
22:45 Kissel back
22:53 Marc back
23:13 Kyle out to MY and EY
23:38 Jeff B out
23:59 Greg out to TCSY table to reset the LASER
24:00 EOS