TITLE: 01/27 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
14:13 Terry out to Squeezer bay
16:00 Karen ad Vanessa out to EY
17:00 Karen and Vanessa back
17:04 Karen ad Vanessa back to EY - with stock
17:05 Marc out to LVEA-returning chassis to SUS rack near HAM
17:12 Dust Monitor at EY not responding
17:21 Betsy out to EY
17:32 Betsy power cycled dust monitor 2 at EY
17:40 Patrick reset the HV at EX
17:43 Travis, Danny, and Angus to EY
17:47 Patrick back
17:57 Richard out to LVEA - camera check PSL
18:01 Richard back
18:06 Terry back
18:20 Betsy back
18:23 Greg out to LVEA - resetting TCSY LASER
18:28 N out to optics lab
18:30 Greg back
18:37 Kyle and Chandra moving new ION pump from large high bay to S side floor near HAM4
18:40 Betsy out to EY
19:19 Terry and N back
19:19 Greg out to LVEA - movin curtains from TCSY to TCSX
19:20 Angus, Travis and Danny back
19:40 Dany out to LVEA - pics
20:00 Danny back
20:00 Betsy back
20:05 Jeff back
21:14 Tvo and Sheila out for lunch
21:45 Kyle out to MY
22:02 Peter and Jeff B out to LVEA- ITMX camera
22:10 N, Sheila and Terry into optics lab
22:16 Kyle back
22:30 N back
22:54 Kyle and Chandra to MY