TITLE: 01/29 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
16:00 (8:00) Start of shift
16:15 (8:15) Hugh to End-Y -- HEPI filter change
16:22 (8:22) Ken to End-X -- Piping work
16:48 (8:48) Hugh out of End-Y
17:47 (9:47) Bartlett to termination slabs -- ITM camera work
17:57 (9:57) Phil to End-X -- Looking at cabling for HEPI
18:36 (10:36) Cheryl to IOT2L -- Align cameras
18:45 (10:45) Ed to HAM6 -- Inspect wire
18:58 (10:58) Jenne, Keita and TVo to HAM6
18:59 (10:59) Phil out of End-X
19:00 (11:00) TJ and Jim to End-Y -- PCal baffle work
19:03 (11:03) Hugh to LVEA -- Retrieve hardware
19:12 (11:12) Phil to End-X
19:15 (11:15) Hugh out of LVEA
19:45 (11:45) Cheryl out from IOT2L
20:01 (12:01) Bartlett out for lunch
20:08 (12:08) TJ and Jim out of End-Y
20:10 (12:10) Phil and Hugh out of End-X
20:20 (12:20) Jenne, TVo, Keita out of LVEA
20:59 (12:59) Bartlett to termination slabs -- ITM camera work
21:05 (13:05) TJ and Jim to End-Y -- PCal baffle work
21:10 (13:11) Kyle to HAM4 -- climb up OMC tube
21:13 (13:13) Travis and Betsy to End-Y -- Putting ETMY back together
21:29 (13:29) Ed to CER -- Terminate cables
21:35 (13:35) Kyle out from HAM4
21:53 (13:53) Peter and Gerardo to Optics Lab
22:06 (14:06) Bubba and Mark to LVEA -- Work on snorkel lift
22:27 (14:27) Elizabeth to HAM6 -- Scan components
22:36 (14:36) Patrick to End-X -- Reset power to HEPI pump control
22:40 (14:40) Nutsinee to ISC Rack
22:40 (14:40) Bubba and Mark out of LVEA
22:50 (14:50) Nutsinee out from ISC Rack
22:53 (14:53) Patrick out of End-X
23:13 (15:13) Bartlett out from termination slabs
23:26 (15:26) Jenne, Keita, and TVo to HAM6
23:30 (15:30) Peter and Gerardo out of Optics Lab
23:47 (15:47) Elizabeth out from HAM6
23:49 (15:49) Terry to SQZ bay
23:54 (15:54) Ed out of CER
0:00 (16:00) End of shift