kyle.ryan@LIGO.ORG - posted 16:37, Thursday 01 February 2018 (40371)
Prepping work area at CP4
Mark D. (Apollo), Kyle R. 

We moved most of the items needed for installation of the Turbo pump and RGA tree at CP4 to the Y-mid VEA.  Mark D. mounted the fan/filter box to the clean room and interfaced the curtains around CP4's 10" gate valve.  

The Technical cleaning crew will do an initial cleaning in the morning and I'll finish "Ameristating" the floor, setting up a stand-alone particle counter etc...  The plan is to have the 12" x 8" x 4.5" x 2.75" reducing cross, 450 L/s turbo pump, valves, gauges and RGA related stuff mounted to CP4's 10" gate valve by the E.O.B tomorrow.