TITLE: 02/05 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
- PSL switched to 35W frontend operations.
- LVEA transitioned to Laser HAZARD.
- Commissioners (T-Vo & Georgia) finishing up IMC A2Ls
LOG:
- 16:43-19:43 Jason joining Peter/Bartlett for switching PSL to 35W frontend operation only.
- 17:33-18:10 LVEA ion pump work (Chandra) [WP 7328]
- 17:46 CP4 decommissioning (Kyle)
- 19:21 Went to get leak detector at EX
- 17:53 Squeezer Bay work (Nutsinee)
- 22:24 Returning to Squeezer Bay (Nutsinee)
- 18:14-19:08 Checking wiring & continue diagnose H1:ISC-RF_C_AMP42M4_POWEROK issues (Marc) [WP 7330]
- 18:45 VOPO optics lab work (Sheila)
- 20:05-20:12 Work in an LVEA cleanroom (Hugh)
- 20:30-20:48 h1susopo model restart & DAQ restart (containing nonexistant OPO extention, and the existing OFI & ZM2 extensions) (kissel, barker)
- Also included some PLC changes from sigg
- 21:40 - 21:50 Above restart didn't take, so another one was run by kissel/barker.
- 20:50-21:31 MY cleaning (karen)
- 21:55-22:50 LVEA/roof tour (kissel)