jason.oberling@LIGO.ORG - posted 12:13, Monday 05 February 2018 - last comment - 15:35, Monday 05 February 2018(40414)
PSL Transitioned to 35W Front End Operation Only (WP 7329)

J. Oberling, P. King, J. Bartlett

This morning we transitioned the PSL to 35W Front End (FE) operation only, per LHO WP 7329

It should be noted that we did not remove the HPO from the cooling loops, therefore water is still flowing through the HPO.  This will be done prior to the start of the 70W amplifier installation.

The beam alignment to the PMC was tweaked to maximize the transmitted power; with the ISS ON, the PMC is transmitting 22.3 W and reflecting 3.0 W.  I took a quick visibility measurement:

With the visibility >90%, no further mode matching work was done at this time.  To get the ISS stable, the reference voltage had to be raised to -0.40 V.  In addition, the FSS Reference Cavity TPD is reading 1.34 V, and we measured ~10 mW in the ALS path being fed into the ALS fiber.

There are a couple more things that need to be done prior to the start of the 70W amplifier installation:

The PSL is now good to go for tomorrow's X-arm peek and any further commissioning required for this week; 70W amplifier prep work begins in earnest next week.  This closes LHO WP 7329.

Comments related to this report
jason.oberling@LIGO.ORG - 15:35, Monday 05 February 2018 (40423)

For clarity, the extra high power attenuation stage I mention above was installed between mirrors M06 and M07 after the HPO was turned on.  This is the stage that needs to be removed; the one between the HPO output and the ISS AOM will remain in the system.