Reports until 08:11, Tuesday 06 February 2018
LHO General
corey.gray@LIGO.ORG - posted 08:11, Tuesday 06 February 2018 (40428)
X-Arm Peek Begins!

TITLE: 02/06 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    Wind: 5mph Gusts, 4mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.57 μm/s
QUICK SUMMARY:

Gate Valve #7 in the LVEA is currently being opened, and we are staging for taking a peak down the X-arm.