TITLE: 02/06 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
Today light was flashed down the X-arm. Locked with green and currently working on locking in red. Not sure if they'll stay here the full time to 8pm, but Jenne said, "will be definitely be here past 4pm." :)
LOG:
- Seismic DMT viewers were down the first few hours in the morning, and came back around 11am.
- Had issue with video4 not being able to run StripTool and medm (Dave tracked to an OS issue....these Macs will soon be swapped out to have the same set up for all FOM computers, so this should be a moot issue soon).
- 15:50 EX electronics work
- 15:56-17:20 Cleaning LVEA (christina and later joined by vanessa, karen)
- 15:57-16:14 Opening GV7 (Chandra)
- 16:11 MY work (Kyle)
- 16:11 Turning OFF ITMx oplev, turned back on later (Sheila, Thomas)
- 16:29-18:03 LN Truck at CP2
- 16:50-17:35 Clean cable work around HAM6 (Hugh)
- 16:55-17:15 Parts at MY (Marc)
- 17:12-18:06 Diode Room checks (Peter)
- 17:22-17:54 EX cleaning
- 17:23 Opening PSL light pipe (Sheila)
- 17:40 ETMy tuning/alignment (Travis, Betsy)
- 17:44-17:53 Moving Contamination Control parts (Bartlett)
- 17:54 LN Truck at CP2 again
- 17:58 Squeezer work (terry)
- 19:51 nutsinee joins
- 22:33 Continuing work (terry) & nutsinee joining at 23:01.
- 18:17 Cintas(mats) vendor
- 18:39 Banging noise at EX begins, tripping ETMx table & disrupting BRS. This was manlift dirving & drilling by Ken. He was later notified to stop noisy work.
- 18:45 Commissioners to EX
- 18:48 Contamination Control/Cleaning Room work throughout day (Bartlett)
- 18:59 portapotty contractor
- 19:00-19:21 PEM photos
- 20:10 MY walk (Peter)
- 22:30 Stickers on elec racks (Fil)
- 22:40-0:00 Craning large parts out of the way at MY (Chandra, Mark)
- 22:48 Cable work in optics lab (Hugh)
- 23:45 EY Temperature alarm